Title 16 SUBDIVISIONS*
Chapter 16.20 IMPROVEMENTS
16.20.010 Procedures.
A. Submittal of Construction Plans. Upon approval of the
preliminary plat, the subdivider shall have prepared by a registered
professional engineer appropriate engineering drawings for the proposed required
improvements containing the data and information specified in Chapters 16.08 and
16.16. Such drawings shall be certified by a registered professional engineer,
and shall be submitted in triplicate to the village engineer.
B. Content of Construction Plans. Engineering drawings for
required improvements shall contain the following minimum information:
1. Plans, details, specifications and cost estimates for
roadway and sidewalk construction, including plans, profile indicating existing
topography and elevation including curb and sidewalk elevation, intersection
control elevation and paving geometrics for each street with a typical
cross-section of the roadway. The profiles of grade lines (both property and
centerlines) shall be shown to a scale of one inch equals fifty feet horizontal,
and one inch equals five feet vertical; or to a scale approved by the municipal
engineer. This information shall be shown on standard plan and profile sheet
unless otherwise required by the village engineer.
2. Plans shall include right-of-way lines, property lines,
center lines of both proposed and existing streets, and survey plat
lines.
3. Details, profiles, specifications and cost estimates of
proposed storm drainage improvements with calculations.
4. Plans, profiles, details, specifications and cost
estimates of proposed water supply facilities.
5. Plans and specifications of proposed sub-surface
facilities for the sanitary sewage facilities.
6. When unusual site or construction conditions exist, the
village engineer may require such additional plans, specifications, and drawings
as may be necessary for an adequate review of the improvements to be
installed.
7. Topography shall be shown by lines drawn at two-foot
contour increments.
8. One set reproducible (mylar or linen) copy of approved
construction plans.
C. Review of Plans. Within three weeks from the date the
construction plans are submitted to the village engineer, he or she shall review
the plans in order to determine whether such drawings comply with village of
Metamora design standards. If such drawings are consistent and so comply, the
village engineer will return two sets of approved construction plans to the
subdivider. In the event that the drawings do not so conform or comply, the
engineer shall notify the subdivider of the specific manner in which such
drawings do not conform. The subdivider will then notify his or her engineer to
correct such drawings. If no notification has been given by the village engineer
within the allotted time period of three weeks, the submitted construction plans
will be considered approved. (Subdivision Ordinance dated 6/3/03 §
5-1)