Chapter 13.52 BUILDING SEWER INSTALLATION
13.52.010 Building sewer materials.
13.52.020 Building sewer joints.
13.52.030 Connection of building sewer to public sewer.
13.52.040 Storm and groundwater connections to building sewer prohibited.
13.52.050 Foundation and floor drains and roof downspouts.
13.52.060 Size, slope and depth.
13.52.070 Permit required--Building sewer.
13.52.080 Permit requirements.
13.52.090 Separate building sewer required--Exception.
13.52.100 Open trench work--Backfill--Inspection.
13.52.110 Excavations to be guarded.
13.52.130 Breaking into sewer.
13.52.140 Use of old building sewer.
13.52.150 Water pressure ejectors.
13.52.160 Inspection and approval of building sewers.
13.52.170 Notice required prior to inspection.
13.52.180 Applicant to pay cost--Building sewer--Connection.